In a complex SSIS Control Flow, there is often a need to have a common last step, regardless of the number of Control Flow end points. Consider the following example:
In this case, we are using the Completion constraint (blue line), and an Expression to determine which path to follow. If there are records, we upload them, if not we end without doing anything. In either case, we are writing a message to a log table, recording the event. As simple as this example is, we have 2 end points. Now, what if we wanted to insert a record in the log that records the time the package ended? In this scenario, we would need to code 2 additional INSERTs to the event log, one for each end point. I am a firm believe in the theory that “the less moving parts the better”. Let’s create an INSERT statement that will be executed regardless of the end point in the Control Flow. ENTER THE EVENT HANDLER.
Let’s add a OnPostExecute event handler to at the Package level. This will be hit when the package finishes, and we can record the Package End event.
Sounds like a great idea, and it’s true that the event handler will trigger on the completion of the package. The problem we face is that events “bubble up” the event tree: http://msdn.microsoft.com/en-us/library/ms140223.aspx. That simply means that the OnPostExecute event will trigger for EVERY task in the package. This is very useful, but it does not help us in the case of recording a Package End event. Here is what our log looks like if we use a OnPostExecute without any constraints or expressions:
This is not exactly what we were going for. So, how do we make SSIS understand that we only want an event written to the log if it is the last event in the package. We could set the DisableEventHandles property to TRUE on every task in the package, but odds are pretty good you will want to track other events besides a Package End event. Here is a modest solution:
By adding a Dummy Task, we can use expressions and constraints to create a Control Flow within the Event Handler. The Dummy Task in this case is simply an Execute SQL Statement:
The Expression used to pick the last event is this:
The @SourceName is a system variable that contains the name of the task that triggered the Event Handler. The @PackageName is also a system variable which contains the name of the package. The package is a task itself….it is a container holding all other tasks, and will always be the last OnPostExecute event. When we run the package now, the results look a little more like what we would expect.
This gives us the power to do ANY processing after ANY task in ANY Event Handler by adding a constraint and expression to the Dummy Task. Event Handlers are extremely useful in creating log files, but they are also great for consolidating duplicate “at end” processing when there are multiple end points, and reducing duplicate processing within parallel data flows. Have fun with it, but beware of the Event Tree!!